Wenlock Edge Farm

Farm Shop rebuild gallery

On 26 May 2025 our farm shop burnt down due to an electrical fault.

You can follow the progress of the rebuilding through this photo gallery.
Or check out our and pages.

Rebuild progress in pictures

(Click on an image to enlarge)

aerial view of Wenlock Farm Shop after it was burnt down on 26 May 2025
26 May 2025 - aerial view of farm shop after the fire
damage to Wenlock Edge Farm shop after the fire on 26 May 2025
26 May 2025 - damage to our farm shop after the fire
Wenlock Edge Farm Shop site has now been cleared ready to be rebuilt after the fire
10 June 2025 - site has been levelled ready to rebuild the shop
Wenlock Edge Farm Shop rebuild after the fire is beginning with the arrival od diggers and a dumper truck
02 September 2025 - diggers and dumper truck on site ready to start the rebuild
Wenlock Edge Farm Shop site marked out and concrete being poured in footings.
02 September 2025 - site marked out and concrete being poured in footings
Erecting the steelwork on Wenlock Edge Farm's new shop.
15 October 2025 - erecting the steekwork
Erecting the steelwork on Wenlock Edge Farm's new shop.
15 October 2025 - erecting the steekwork
Erecting the steelwork on Wenlock Edge Farm's new shop.
15 October 2025 - erecting the steekwork
Completed steelwork on Wenlock Edge Farm's new shop.
16 October 2025 - completed steekwork
Rebar mesh and membrane completed ready for concrete in rebuild of Wenlock Edge Farm Shop.
31 October 2025 - ready for concrete
Stopped raining so concrete going down - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - stopped raining so concrete going down
concrete going down - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - concrete going down
concrete going down - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - concrete going down
concrete going down - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - concrete going down
finishing the concrete floor - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - final finishes to the concrete floor
finishing the concrete floor - rebuild of Wenlock Edge Farm Shop.
17 November 2025 - final finishes to the concrete floor
roof on - rebuild of Wenlock Edge Farm Shop.
20 November 2025 - the roof is on
walls going up - rebuild of Wenlock Edge Farm Shop.
24 November 2025 - walls going up
starting on the interior - rebuild of Wenlock Edge Farm Shop.
24 November 2025 - starting on the interior
fridges taking shape - rebuild of Wenlock Edge Farm Shop.
27 November 2025 - fridges taking shape
fridges taking shape - rebuild of Wenlock Edge Farm Shop.
27 November 2025 - fridges taking shape
fridges taking shape - rebuild of Wenlock Edge Farm Shop.
27 November 2025 - fridges taking shape
fridges taking shape - rebuild of Wenlock Edge Farm Shop.
27 November 2025 - fridges taking shape
Exterior of Wenlock Edge Farm's new shop now completed.
28 November 2025 - looking good from the outside